
5.2 Connecting the base unit and expansion modules
5 Installation
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
5-2
5.2Connecting the base unit and expansion modules5200Connecting the base unit and expansion modules5-Montage_multi_Anzahl_Module_links_1
You can install a maximum of 1 PNOZ mmc3p to the left of the base
unit.
Montage_multi_Modul_verbind_links_mini_BA
Connect the base unit and the expansion module as described in the
operating instructions for the base units.
Connect the black/yellow terminator to the expansion module
Install the expansion module in the position in which it is configured
in the PNOZmulti Configurator.
Komentáře k této Příručce